- How is this different from Veeva PromoMats?
- PromoMats sits in the MLR workflow tool category: it routes content for review, records the approval and holds the approved asset. That category does its job and then stops once the content is approved. Pre-check runs one step earlier, clearing the asset before it enters MLR, and Juncture keeps watching the published content with Answer Monitor after launch. Juncture is the only pharma content intelligence platform that joins a pre-MLR asset check, an approved-content system of record, and AI answer monitoring, all measured against the same approved label. You attach the Pre-check report to your PromoMats submission today, and a Veeva Vault connector is on the roadmap.
- Does this replace MLR?
- No. Pre-check backs the reviewer, it does not replace them. A named MLR reviewer still makes the call and signs off. Pre-check catches reuse, claim, figure, visual, fair balance, ISI and off-label issues before the asset reaches review, so the reviewer opens to a sourced shortlist with every verdict tied to a label clause, instead of a blank page. The decision and the e-signature stay with your reviewer.
- Can the report be attached to PromoMats?
- Yes, today. Pre-check exports an audit-ready report with the reuse percentage, every verdict and its clause citation, the fair balance and ISI rows, and the named e-signature sign-off. You attach that exported report to your MLR or PromoMats submission as the supporting record. A Veeva Vault connector that lands the report in PromoMats without a manual attach step is on the roadmap.
- Where does the asset come from, and what file types work?
- Drop in the asset you are about to send to MLR. Juncture reads a PDF, the common image formats (PNG, JPG, TIFF) and slide decks (PowerPoint), so a leave-behind, a banner, a detail aid or a deck all go through the same check. The piece is read where it sits in your workflow, before it reaches the reviewer.
- What does the pre-check return?
- A reuse percentage with a block-by-block breakdown tagged exact-match, light-edit or new, plus a verdict on every claim, figure and visual checked against the label clause it answers to. Fair balance and ISI get their own rows, and any off-label use is flagged with the clause and the reason attached.
- How does Pre-check show content reuse?
- Pre-check breaks an asset into content blocks and matches each one back to your already-approved modules. It returns a reuse percentage and tags every block exact-match, light-edit or new, so the reviewer can see at a glance that most of the asset carries no new claim and only the genuinely new copy needs fresh review.
- How does Pre-check verify an approved image?
- Pre-check compares the pack shot, device render and logo in an asset to the approved versions in your asset library. It flags a look-alike, an old version or an altered visual, so a piece never ships with the wrong image or the wrong package. The source and version of the matched asset are recorded.
- Does it check fair balance and the ISI?
- Yes. Fair balance and the Important Safety Information each get a dedicated check in the report: present, legible and carried with equal prominence to the benefit claims. A missing or buried safety statement is flagged against the label clause that requires it.
- Can Pre-check catch off-label use?
- Yes. Pre-check flags claims and phrasing that imply a use, population or benefit outside the approved indication, and ties each flag to the relevant label clause. The flag travels with the asset when it is routed to MLR, with the reason attached.
- What happens after the check, and how does it reach PromoMats?
- Pre-check exports an audit-ready report: the reuse percentage, every verdict with its clause citation, the fair balance and ISI rows, and the sign-off. Today you attach that exported report to your MLR or PromoMats submission. A Veeva Vault connector is on the roadmap.
- Who signs off, and how does it support 21 CFR Part 11?
- A named reviewer signs off with an e-signature. Juncture provides the technical controls for 21 CFR Part 11: a time-stamped, tamper-evident audit trail, e-signature sign-off, and role-based access control. You validate it for Part 11 use under your own SOPs. Pre-check backs the reviewer, it does not replace them.